This project, tendered by the General Directorate of Highways 2nd Regional Directorate and carried out with a 50% partnership between AYK Yol and Özaykut Yapı, was successfully completed on November 10, 2018. As part of the works, earth leveling, infrastructure, and superstructure works were carried out between İzmir Çeşme and Karaburun, and the modernization of the road network was ensured.